For Server Build Teams
Give every builder the same measurable plan.
Why a shared plan helps
Teams lose time when screenshots and dimensions disagree.
Recommended sequence
- 1Lock one share URL.
- 2Assign quadrants or layers.
- 3Use the same material selection.
- 4Track completion against the plan.
Frequently asked questions
- What belongs in a handoff?
- Include the share URL, assigned quadrant or layer, material, and last verified checkpoint.
- Should every builder count independently?
- No. Mirror a verified source quadrant and use the shared plan as the authority.
- How should corrections be recorded?
- Keep the mismatch visible, correct the first wrong checkpoint, and update the shared status.